Bathroom fitting
Bathroom fitting in Hull and the East Riding
A bathroom is the room people notice, and the one most likely to be fitted badly. Silicone that peels within a year, tiles that lip, a shower tray that never quite drains. We fit bathrooms so those things do not happen.
How a bathroom job runs
We visit, measure properly and talk through what you actually want, then give you a written fixed quote. No day rate that quietly grows.
Most full bathrooms take between five and fifteen working days depending on the amount of tiling and whether anything structural is moving. We tell you which days are noisy and which days you will be without a working toilet, so you can plan around it.
The details that decide whether it lasts
Falls set correctly so water goes to the waste rather than sitting in a corner. Boards behind tiles that can cope with moisture. Sealant applied to a dry, clean joint and tooled properly.
We clean up at the end of every day rather than leaving the room as a building site until the last afternoon.
Before and after
Drag the handle to see the difference. These are real jobs, not showroom photography.
